tallcoleman's Notes
Notes submitted or commented on by tallcoleman
| Id | Creator | Description | Created at | Last changed | |
|---|---|---|---|---|---|
| 4397156 | tallcoleman | Building has a small community kitchen facility on E side |
|||
| 4210610 | Street_food_addiction | Sign set up for meadoway construction. Est completion date fall 2024 on the sign. |
|||
| 4628592 | tallcoleman | Are these portable washrooms still here? |
|||
| 4628586 | tallcoleman | Is there a washroom in this building? (If yes, what are its opening hours, features, etc.?) |
|||
| 4622860 | tallcoleman | Construction on 1350 Ellesmere Rd is now finished |
|||
| 4456358 | tallcoleman | This building may actually be a picnic shelter and not a washroom - please confirm |
|||
| 4266488 | tallcoleman | There are some stairs here, but they have a very steep ramp next to them |
|||
| 4266489 | tallcoleman | Stairs here, but there is a ramp next to them. Ramp is very steep and only about 2/3 of a metre wide |
|||
| 4266789 | tallcoleman | This area is often accessed by bicycles, often via the informal (very steep) worn path alongside the stairs or by riding the path down to the washroom and cutting across the field. |
|||
| 4336627 | tallcoleman | Footpath connection here to the Alley Road. About 2 m wide surface is concrete. |